Skip to content
Open buying file ↗
Direct questions · 2026-10-16

Sources

Sources below were found during this research. Public utility and operator pages can change; preserve the relevant version in a transaction evidence register. URLs are provided in code formatting for traceability.

Utility service, tariffs and regulatory developments

  1. Dominion Energy — Data Center Requests. Service-territory check, enquiry process and load-letter route. `https://www.dominionenergy.com/virginia/large-business-services/data-center-requests (dominionenergy.com)
  2. Dominion Energy — Data Center Load Letter. Utility-specific application template. `https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/large-business-services/pdfs/virginia/data-center-load-letter.pdf?rev=5af80441e2584283a96ae3f127f884a0 (cdn-dominionenergy-prd-001.azureedge.net)
  3. AEP Ohio — Data Center Tariff. Published process, effective date and contractual/billing provisions. `https://www.aepohio.com/company/about/rates/data-center-tariff/ (aepohio.com)
  4. Virginia SCC — Dominion biennial-review decision, 25 November 2025. GS-5 effective date and minimum-demand provisions. `https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html (scc.virginia.gov)
  5. Virginia SCC — Data Center Initiatives factsheet, 24 February 2026. Contract, minimum-charge and collateral provisions. `https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/fact-sheets/scc-data-center-initiatives-02-2026.pdf (scc.virginia.gov)
  6. Virginia SCC — Transmission Line Projects. Public route to relevant proceedings. `https://www.scc.virginia.gov/consumers/public-utility/electricity-faqs/transmission-line-projects/ (scc.virginia.gov)
  7. California environmental-review record — utility letters. Includes SCE’s 6 May 2019 letter, PDF page 7; an illustrative historical document. `https://files.ceqanet.lci.ca.gov/316320-1/attachment/84VDB5hNE1Okjr5-CkbBEwIzynEndS4BgyrAbrUhyuNsskQqfC-lqOLQqnzVMW3YAuPzcxrgIX1WQoRt0 (files.ceqanet.lci.ca.gov)
  8. FERC — Large-load integration action, 18 June 2026. Scope of the regional tariff review. `https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration (ferc.gov)
  9. ERCOT — Batch Zero approval announcement, 18 June 2026. Framework, threshold and flexibility pathways. `https://www.ercot.com/news/release/06182026-puct-approves-ercots (ercot.com)
  10. ERCOT — Market Notice M-A080326-01, 3 August 2026. Change to Batch Zero timelines following the verification direction. `https://www.ercot.com/services/comm/mkt_notices/M-A080326-01 (ercot.com)
  11. Office of the Texas Governor — TCEQ directive, 21 September 2026. Permit pause and compliance-update requirement. `https://gov.texas.gov/news/post/governor-abbott-directs-tceq-to-halt-data-center-permits (gov.texas.gov)
  12. Texas Attorney General — Water-use reporting letters, 15 October 2026. Announcement concerning 156 developments. `https://www.texasattorneygeneral.gov/news/releases/attorney-general-ken-paxton-sends-letters-data-center-developments-across-texas-ensure-reporting (texasattorneygeneral.gov)

Environmental requirements and electricity economics

  1. TCEQ — Construction Stormwater General Permit assistance. Applicability and common-plan treatment. `https://www.tceq.texas.gov/assistance/water/stormwater/sw-construction.html (tceq.texas.gov)
  2. TCEQ — Standard Air Permits. Natural-gas generating-unit authorisation pathway. `https://www.tceq.texas.gov/permitting/air/newsourcereview/standard (tceq.texas.gov)
  3. EPA — Clean Air Act Resources for Data Centers. Stationary-source regulatory resources. `https://www.epa.gov/stationary-sources-air-pollution/clean-air-act-resources-data-centers (epa.gov)
  4. DOE — Cooling Water Efficiency Opportunities for Federal Data Centers. PUE definition and facility-energy boundary. `https://www.energy.gov/cmei/femp/cooling-water-efficiency-opportunities-federal-data-centers (energy.gov)
  5. DOE — Best Practices Guide for Energy-Efficient Data Center Design, 2024. Breadth of the facility-design assessment. `https://www.energy.gov/cmei/femp/articles/best-practices-guide-energy-efficient-data-center-design (energy.gov)
  6. DOE — Evaluating Your Utility Rate Options. Energy, demand and system-peak rate components. `https://www.energy.gov/cmei/femp/evaluating-your-utility-rate-options (energy.gov)
  7. DOE — Electricity-storage handbook chapter on demand charges. Historical reference for peak-demand and ratchet concepts, not a current tariff. `https://www.energy.gov/sites/default/files/2022-10/Chapter_13-Electric.pdf (energy.gov)
  8. EPA — Physical PPA. Physical versus financial procurement and certificate ownership. `https://www.epa.gov/green-power-markets/physical-ppa (epa.gov)

Hardware, cooling, commissioning and delivery

  1. NVIDIA — DGX GB Rack Scale Systems hardware guide. Rack configuration, approximate power and hybrid cooling; page updated 17 September 2026. `https://docs.nvidia.com/dgx/dgxgb200-user-guide/hardware.html (docs.nvidia.com)
  2. NVIDIA — DGX GB200 SuperPOD architecture. Compute, network, storage and cooling architecture. `https://docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-gb200/latest/dgx-superpod-architecture.html (docs.nvidia.com)
  3. Open Compute Project — Modular Technology Cooling Systems, 2025 revision. Pre-commissioning and contamination-control guidance. `https://www.opencompute.org/documents/ocp-modular-tcs-rev-1-final-2025-pdf (opencompute.org)
  4. Amazon Jobs — Commissioning Engineer, Job ID 10455139. First-party evidence of commissioning scope and responsibilities; not a project-delivery guarantee. `https://amazon.jobs/en-gb/jobs/10455139/commissioning-engineer (amazon.jobs)
  5. DVL Power Hour — Delivering Data Center Power, 30 March 2026. Practitioner interview on utility delivery stages. `https://www.buzzsprout.com/1327870/episodes/18933365-delivering-data-center-power-how-utilities-enable-uptime?t=0 (buzzsprout.com)
  6. Uptime Institute — Tier Certification of Design Documents. Scope of design certification and distinction from constructed-facility certification. `https://uptimeinstitute.com/tier-certification/design (uptimeinstitute.com)
  7. Uptime Institute — Tier Classification System. Classification definitions. `https://uptimeinstitute.com/tiers (uptimeinstitute.com)
  8. IREN — 2026 annual-report filing. Company disclosure of ERCOT-related energisation risks. `https://www.sec.gov/Archives/edgar/data/1878848/000114036126039453/ny20078226x3_ars.pdf (sec.gov)

Operator capability disclosures—not verified availability

  1. DataBank — DFW9, Red Oak. Facility and cabinet-capability disclosure. `https://www.databank.com/data-centers/dallas/red-oak-campus/dfw9/ (databank.com)
  2. Digital Realty — Dallas facilities. Metro facility directory. `https://www.digitalrealty.com/data-centers/americas/dallas (digitalrealty.com)
  3. Digital Realty — High-Density Colocation. Product-level cooling and density options. `https://www.digitalrealty.com/platform-digital/colocation/high-density-colocation (digitalrealty.com)
  4. Flexential — Dallas. Metro-facility disclosure. `https://lp.flexential.com/R6-Dallas.html (lp.flexential.com)
  5. Flexential — Liquid Cooling Applications guide. Operator description of cooling approaches. `https://www.flexential.com/system/files/file/2025-12/flexential-liquid-cooling-applications-hvc.pdf?t=1778954597 (flexential.com)

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.

  1. www.dominionenergy.com
  2. cdn-dominionenergy-prd-001.azureedge.net
  3. www.aepohio.com
  4. www.scc.virginia.gov
  5. www.scc.virginia.gov
  6. www.scc.virginia.gov
  7. files.ceqanet.lci.ca.gov
  8. www.ferc.gov
  9. www.ercot.com
  10. www.ercot.com
  11. gov.texas.gov
  12. www.texasattorneygeneral.gov
  13. www.tceq.texas.gov
  14. www.tceq.texas.gov
  15. www.epa.gov
  16. www.energy.gov
  17. www.energy.gov
  18. www.energy.gov
  19. www.energy.gov
  20. www.epa.gov
  21. docs.nvidia.com
  22. docs.nvidia.com
  23. www.opencompute.org
  24. amazon.jobs
  25. www.buzzsprout.com
  26. uptimeinstitute.com
  27. uptimeinstitute.com
  28. www.sec.gov
  29. www.databank.com
  30. www.digitalrealty.com
  31. www.digitalrealty.com
  32. lp.flexential.com
  33. www.flexential.com
Read the complete report and source register →

Put the evidence to work.

Keep your requirements, open questions and commitment conditions together.