Sources below were found during this research. Public utility and operator pages can change; preserve the relevant version in a transaction evidence register. URLs are provided in code formatting for traceability.
Utility service, tariffs and regulatory developments
- Dominion Energy — Data Center Requests. Service-territory check, enquiry process and load-letter route. `https://www.dominionenergy.com/virginia/large-business-services/data-center-requests (dominionenergy.com)
- Dominion Energy — Data Center Load Letter. Utility-specific application template. `https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/large-business-services/pdfs/virginia/data-center-load-letter.pdf?rev=5af80441e2584283a96ae3f127f884a0 (cdn-dominionenergy-prd-001.azureedge.net)
- AEP Ohio — Data Center Tariff. Published process, effective date and contractual/billing provisions. `https://www.aepohio.com/company/about/rates/data-center-tariff/ (aepohio.com)
- Virginia SCC — Dominion biennial-review decision, 25 November 2025. GS-5 effective date and minimum-demand provisions. `https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html (scc.virginia.gov)
- Virginia SCC — Data Center Initiatives factsheet, 24 February 2026. Contract, minimum-charge and collateral provisions. `https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/fact-sheets/scc-data-center-initiatives-02-2026.pdf (scc.virginia.gov)
- Virginia SCC — Transmission Line Projects. Public route to relevant proceedings. `https://www.scc.virginia.gov/consumers/public-utility/electricity-faqs/transmission-line-projects/ (scc.virginia.gov)
- California environmental-review record — utility letters. Includes SCE’s 6 May 2019 letter, PDF page 7; an illustrative historical document. `https://files.ceqanet.lci.ca.gov/316320-1/attachment/84VDB5hNE1Okjr5-CkbBEwIzynEndS4BgyrAbrUhyuNsskQqfC-lqOLQqnzVMW3YAuPzcxrgIX1WQoRt0 (files.ceqanet.lci.ca.gov)
- FERC — Large-load integration action, 18 June 2026. Scope of the regional tariff review. `https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration (ferc.gov)
- ERCOT — Batch Zero approval announcement, 18 June 2026. Framework, threshold and flexibility pathways. `https://www.ercot.com/news/release/06182026-puct-approves-ercots (ercot.com)
- ERCOT — Market Notice M-A080326-01, 3 August 2026. Change to Batch Zero timelines following the verification direction. `https://www.ercot.com/services/comm/mkt_notices/M-A080326-01 (ercot.com)
- Office of the Texas Governor — TCEQ directive, 21 September 2026. Permit pause and compliance-update requirement. `https://gov.texas.gov/news/post/governor-abbott-directs-tceq-to-halt-data-center-permits (gov.texas.gov)
- Texas Attorney General — Water-use reporting letters, 15 October 2026. Announcement concerning 156 developments. `https://www.texasattorneygeneral.gov/news/releases/attorney-general-ken-paxton-sends-letters-data-center-developments-across-texas-ensure-reporting (texasattorneygeneral.gov)
Environmental requirements and electricity economics
- TCEQ — Construction Stormwater General Permit assistance. Applicability and common-plan treatment. `https://www.tceq.texas.gov/assistance/water/stormwater/sw-construction.html (tceq.texas.gov)
- TCEQ — Standard Air Permits. Natural-gas generating-unit authorisation pathway. `https://www.tceq.texas.gov/permitting/air/newsourcereview/standard (tceq.texas.gov)
- EPA — Clean Air Act Resources for Data Centers. Stationary-source regulatory resources. `https://www.epa.gov/stationary-sources-air-pollution/clean-air-act-resources-data-centers (epa.gov)
- DOE — Cooling Water Efficiency Opportunities for Federal Data Centers. PUE definition and facility-energy boundary. `https://www.energy.gov/cmei/femp/cooling-water-efficiency-opportunities-federal-data-centers (energy.gov)
- DOE — Best Practices Guide for Energy-Efficient Data Center Design, 2024. Breadth of the facility-design assessment. `https://www.energy.gov/cmei/femp/articles/best-practices-guide-energy-efficient-data-center-design (energy.gov)
- DOE — Evaluating Your Utility Rate Options. Energy, demand and system-peak rate components. `https://www.energy.gov/cmei/femp/evaluating-your-utility-rate-options (energy.gov)
- DOE — Electricity-storage handbook chapter on demand charges. Historical reference for peak-demand and ratchet concepts, not a current tariff. `https://www.energy.gov/sites/default/files/2022-10/Chapter_13-Electric.pdf (energy.gov)
- EPA — Physical PPA. Physical versus financial procurement and certificate ownership. `https://www.epa.gov/green-power-markets/physical-ppa (epa.gov)
Hardware, cooling, commissioning and delivery
- NVIDIA — DGX GB Rack Scale Systems hardware guide. Rack configuration, approximate power and hybrid cooling; page updated 17 September 2026. `https://docs.nvidia.com/dgx/dgxgb200-user-guide/hardware.html (docs.nvidia.com)
- NVIDIA — DGX GB200 SuperPOD architecture. Compute, network, storage and cooling architecture. `https://docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-gb200/latest/dgx-superpod-architecture.html (docs.nvidia.com)
- Open Compute Project — Modular Technology Cooling Systems, 2025 revision. Pre-commissioning and contamination-control guidance. `https://www.opencompute.org/documents/ocp-modular-tcs-rev-1-final-2025-pdf (opencompute.org)
- Amazon Jobs — Commissioning Engineer, Job ID 10455139. First-party evidence of commissioning scope and responsibilities; not a project-delivery guarantee. `https://amazon.jobs/en-gb/jobs/10455139/commissioning-engineer (amazon.jobs)
- DVL Power Hour — Delivering Data Center Power, 30 March 2026. Practitioner interview on utility delivery stages. `https://www.buzzsprout.com/1327870/episodes/18933365-delivering-data-center-power-how-utilities-enable-uptime?t=0 (buzzsprout.com)
- Uptime Institute — Tier Certification of Design Documents. Scope of design certification and distinction from constructed-facility certification. `https://uptimeinstitute.com/tier-certification/design (uptimeinstitute.com)
- Uptime Institute — Tier Classification System. Classification definitions. `https://uptimeinstitute.com/tiers (uptimeinstitute.com)
- IREN — 2026 annual-report filing. Company disclosure of ERCOT-related energisation risks. `https://www.sec.gov/Archives/edgar/data/1878848/000114036126039453/ny20078226x3_ars.pdf (sec.gov)
Operator capability disclosures—not verified availability
- DataBank — DFW9, Red Oak. Facility and cabinet-capability disclosure. `https://www.databank.com/data-centers/dallas/red-oak-campus/dfw9/ (databank.com)
- Digital Realty — Dallas facilities. Metro facility directory. `https://www.digitalrealty.com/data-centers/americas/dallas (digitalrealty.com)
- Digital Realty — High-Density Colocation. Product-level cooling and density options. `https://www.digitalrealty.com/platform-digital/colocation/high-density-colocation (digitalrealty.com)
- Flexential — Dallas. Metro-facility disclosure. `https://lp.flexential.com/R6-Dallas.html (lp.flexential.com)
- Flexential — Liquid Cooling Applications guide. Operator description of cooling approaches. `https://www.flexential.com/system/files/file/2025-12/flexential-liquid-cooling-applications-hvc.pdf?t=1778954597 (flexential.com)
Sources & research context
Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.
- www.dominionenergy.com
- cdn-dominionenergy-prd-001.azureedge.net
- www.aepohio.com
- www.scc.virginia.gov
- www.scc.virginia.gov
- www.scc.virginia.gov
- files.ceqanet.lci.ca.gov
- www.ferc.gov
- www.ercot.com
- www.ercot.com
- gov.texas.gov
- www.texasattorneygeneral.gov
- www.tceq.texas.gov
- www.tceq.texas.gov
- www.epa.gov
- www.energy.gov
- www.energy.gov
- www.energy.gov
- www.energy.gov
- www.epa.gov
- docs.nvidia.com
- docs.nvidia.com
- www.opencompute.org
- amazon.jobs
- www.buzzsprout.com
- uptimeinstitute.com
- uptimeinstitute.com
- www.sec.gov
- www.databank.com
- www.digitalrealty.com
- www.digitalrealty.com
- lp.flexential.com
- www.flexential.com