Do-it-yourself game plans · 2026-10-16

Sources

Primary regulatory, utility and OEM material takes precedence for the specific matters it governs. Market benchmarks retain their original scope; proposed workflows and numerical illustrations are identified separately. Accessible podcast transcripts and webinar descriptions were used for practitioner context, not treated as engineering certifications.

  1. AEP Ohio — Data Center Tariff and application process. `https://www.aepohio.com/company/about/rates/data-center-tariff/
  2. Virginia SCC — Data Center Initiatives factsheet, posted 24 February 2026. `https://www.scc.virginia.gov/media/sccvirginiagov-home/about-the-scc/fact-sheets/scc-data-center-initiatives-02-2026.pdf
  3. Office of the Texas Governor — TCEQ data-centre permit directive, 21 September 2026. `https://gov.texas.gov/news/post/governor-abbott-directs-tceq-to-halt-data-center-permits
  4. ERCOT — Large Load Integration and verification documents. `https://www.ercot.com/services/rq/large-load-integration
  5. ERCOT — Resource Integration. `https://www.ercot.com/services/rq/integration
  6. FERC — Large-load show-cause orders, 18 June 2026. `https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration
  7. Texas Register — Adopted economic-regulation rules, 2 October 2026, including large-load interconnection provisions. `https://www.sos.state.tx.us/texreg/archive/October22026/Adopted%20Rules/16.ECONOMIC%20REGULATION.html
  8. DOE — Cooling Water Efficiency Opportunities for Federal Data Centers; PUE definition. `https://www.energy.gov/cmei/femp/cooling-water-efficiency-opportunities-federal-data-centers
  9. DOE Better Buildings — Power Purchase Agreements overview. `https://betterbuildingssolutioncenter.energy.gov/sites/default/files/attachments/PowerPurchaseAgreements.pdf
  10. Dominion Energy — GS-5 Large Load Rate Class Report; contracting-process description. `https://sustainability.dominionenergy.com/GS-5%20Large%20Load%20Rate%20Class%20Report.pdf
  11. Amazon Jobs — Energy Strategy Manager, AWS Energy Team; coordination responsibilities. `https://www.amazon.jobs/en/jobs/10534302/r-energy-strategy-manager-aws-energy-team
  12. Fairfax County — Data Centers; local planning and substation review. `https://www.fairfaxcounty.gov/topics/data-centers
  13. TCEQ — Construction Stormwater General Permit assistance. `https://www.tceq.texas.gov/assistance/water/stormwater/sw-construction.html
  14. EPA — Brownfields All Appropriate Inquiries. `https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries
  15. NVIDIA — DGX SuperPOD GB200 reference architecture. `https://docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-gb200/latest/dgx-superpod-architecture.html
  16. NVIDIA — DGX GB Rack Scale Systems User Guide. `https://docs.nvidia.com/dgx/dgxgb200-user-guide/
  17. NVIDIA — Mission Control integration with building-management systems. `https://docs.nvidia.com/mission-control/docs/nmc-software-installation-guide/2.2.0/integration-of-bms-with-bcm.html
  18. JLL — 2026 Global Data Center Outlook. `https://www.jll.com/content/dam/jllcom/en/global/documents/reports/research-reports/26-research-global-data-center-outlook-new.pdf
  19. Cushman & Wakefield — 2026 Data Center Development Cost Guide. `https://www.cushmanwakefield.com/en/united-states/insights/data-center-development-cost-guide
  20. EPA — Clean Air Act Resources for Data Centers. `https://www.epa.gov/stationary-sources-air-pollution/clean-air-act-resources-data-centers
  21. EPA — Islanded-generation permitting guidance announcement, 27 July 2026. `https://www.epa.gov/newsreleases/epa-issues-permitting-guidance-further-president-trumps-agenda-promoting-data-centers?trk=article-ssr-frontend-pulse_little-text-block
  22. FERC — PJM co-location order announcement, 18 December 2025. `https://www.ferc.gov/news-events/news/ferc-directs-nations-largest-grid-operator-create-new-rules-embrace-innovation-and
  23. FERC — December 2025 PJM co-location order. `https://www.ferc.gov/sites/default/files/2025-12/E-1%20EL25-49-000.pdf
  24. Uptime Institute — Data Center Commissioning: Early and Often. `https://uptimeinstitute.com/webinars/data-center-commissioning-early-and-often
  25. Uptime Institute/BrightTALK — AI-ready infrastructure commissioning webinar description. `https://www.brighttalk.com/webcast/14219/673785
  26. DVL Power Hour — Delivering Data Center Power: How Utilities Enable Uptime, 30 March 2026; transcript. `https://www.buzzsprout.com/1327870/episodes/18933365-delivering-data-center-power-how-utilities-enable-uptime?t=0

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.