Do-it-yourself game plans · 2026-10-16

What has changed that buyers should check immediately?

A diligence pack assembled earlier in 2026 needs a regulatory and process refresh before another payment. These examples illustrate why the applicable date and jurisdiction belong beside every conclusion.

Area Dated evidence Immediate buyer action
Texas permitting On 21 September 2026, the governor directed TCEQ to halt permits sought by data centres pending the relevant audit information. The directive requests a compliance update on 19 October 2026; that is not an announced reopening date. Obtain written confirmation of the directive’s application to the project and each pending authorisation. Do not underwrite an assumed October reopening. (gov.texas.gov)
ERCOT large loads ERCOT’s large-load page includes Batch Zero eligibility-verification material updated 14 October 2026. It distinguishes verification, interconnection documentation and energisation requests. Ask the interconnecting provider to identify the project’s classification, outstanding verification and separate energisation requirements. (ercot.com)
AEP Ohio applications Its published second 2026 study tranche required applications by 30 September 2026, with studies commencing 1 October 2026. Those dates have passed. Confirm the next applicable processing window rather than assuming immediate entry. (aepohio.com)
Dominion Virginia contracts The SCC’s February 2026 factsheet specifies a minimum 14-year service obligation for qualifying new large-load customers contracting on or after 1 January 2027, alongside other large-load protections. Model the agreement’s actual signing date, applicability and operative tariff. Do not describe every provision as already applicable to every customer. (scc.virginia.gov)
Federal transmission rules On 18 June 2026, FERC issued region-specific show-cause orders to six jurisdictional regional grid operators concerning large-load integration. Track the relevant proceeding and effective tariff. A reform proceeding is not a site-specific connection approval. (ferc.gov)

These are examples, not a national legal survey. For the Texas directive, this research did not establish a subsequent general reopening; project-specific treatment requires confirmation.

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.

  1. gov.texas.gov
  2. www.ercot.com
  3. www.aepohio.com
  4. www.scc.virginia.gov
  5. www.ferc.gov
Read the complete report and source register →

Put the evidence to work.

Keep your requirements, open questions and commitment conditions together.