Aim for an auditable decision, not a promise that every external approval can be completed in three months.
Days 1–10: establish control
- Approve the requirements brief and next financial decision.
- Appoint the integration lead and specialist reviewers.
- Establish the evidence register and secure document room.
- Request complete utility and operator documents.
- Identify the most important unknown for each candidate.
Days 11–30: test the shortlist
- Submit complete enquiries through the correct channels.
- Obtain local permission and land-control advice.
- Issue the common technical and commercial RFP.
- Start the monthly economics model.
- Remove alternatives that fail a non-negotiable condition.
Days 31–60: resolve consequential uncertainty
- Review available studies and agreements with the responsible specialists.
- Reconcile power, cooling and hardware requirements.
- Obtain equipment and off-site-work evidence.
- Build the integrated schedule and downside cases.
- Negotiate the principal commencement, cancellation and acceptance issues.
Days 61–90: approve the next bounded commitment
- Reconfirm the evidence that supports the preferred option.
- Record unresolved external milestones explicitly.
- Obtain specialist sign-offs within their scopes.
- Present the six-gate assessment, monthly cost model and exposure schedule.
- Approve, condition, extend or reject the specific commitment.
For practitioner orientation, DVL’s March 2026 podcast with a Georgia Transmission project manager discusses the utility delivery lifecycle, while Uptime’s commissioning material addresses the facility-testing side. Use these to improve your questions—not as substitutes for the project’s documents or a claim that every utility follows the same sequence. (buzzsprout.com)
Sources & research context
Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.
Read the complete report and source register →