Use six independent gates and a specific next-action recommendation. Never replace blockers with a weighted average.
| Gate | Evidence required for your decision | Accountable reviewer |
|---|---|---|
| 1. Land control | Appropriate control, access, rights and identified title issues | Real-estate counsel |
| 2. Planning and permissions | Applicable authorisations, conditions and remaining approval path | Land-use counsel and permitting lead |
| 3. Utility arrangements | Studied requirement, operative agreements, charges and conditions | Energy lead and counsel |
| 4. Network works | Scope, ownership, rights, procurement and schedule dependencies | Utility PM and owner’s engineer |
| 5. Equipment and facility systems | Hardware compatibility, capacity reconciliation and delivery evidence | Technical lead and integrator |
| 6. Commissioning and operations | Acceptance strategy or results, responsibility and handover readiness | Commissioning authority and operations lead |
For each gate, show:
- Evidence status and separate blocker flag.
- Document and assessment dates.
- The exact condition still unresolved.
- Responsible person and required resolution date.
- Financial exposure if the next payment proceeds.
- Whether the condition can be resolved before that payment.
Finish with one of four recommendations:
- Proceed: evidence supports this specific commitment within the approved exposure.
- Proceed conditionally: release only a defined amount, subject to named conditions.
- Extend or redesign: preserve the option while resolving the identified problem.
- Reject this alternative: the requirement or approved risk limit cannot be met on the supported facts.
Sources & research context