Expert Q&A · 2026-10-16

Which dated developments should shape the discussion?

These are specific developments found in the research, not an exhaustive legal-status register. Counsel should establish the operative rules for the project before commitment.

Dated evidence What it establishes Interview implication
18 June 2026: FERC large-load show-cause orders FERC directed six jurisdictional regional grid operators to justify or reform relevant tariffs, including study processes, cost allocation, co-location and flexible transmission service. This was not a single nationwide site-connection approval. (ferc.gov) Ask which filed or approved provisions actually govern the project—not whether federal policy generally supports faster connections.
August 2026: NERC large-load FAQ NERC described proposed computational-load registration criteria and standards development, with submission of new or modified standards and registry criteria required by 31 December 2026. That deadline remained in the future at this research cut-off. (nerc.com) Separate existing obligations from proposed requirements and assess the consequences of subsequent design changes.
3 September 2026: ERCOT Batch Zero notice ERCOT described conditional classifications that could depend on verification, correction of dynamic-model deficiencies or a regulatory exception. (ercot.com) Ask for the project’s classification and outstanding conditions; inclusion alone should not be presented as unconditional readiness.
Dominion GS-5: approved future commencement Virginia’s official legislative briefing records approval of GS-5 with an effective date of 1 January 2027, including different minimum-demand percentages for transmission/distribution and generation. (apps.dlas.virginia.gov) Model the tariff applicable during the deployment period, not only the tariff applicable when the site is shortlisted.

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.

  1. www.ferc.gov
  2. www.nerc.com
  3. www.ercot.com
  4. apps.dlas.virginia.gov
Read the complete report and source register →

Put the evidence to work.

Keep your requirements, open questions and commitment conditions together.