Stage 1: What exactly must be delivered, and by when?

Write a one-page load-and-date brief before asking suppliers for proposals. Otherwise, different parties may answer different questions.

What belongs in the brief?

  • [ ] Site coordinates or acceptable geography, contracting entity and decision owner.
  • [ ] Critical IT MW required in each phase, including compute, storage and networking.
  • [ ] Proposed utility service demand, separately identified and subject to engineering confirmation.
  • [ ] Rack quantities, exact equipment configurations and required rack density.
  • [ ] Monthly load ramp, expected operating pattern and acceptable curtailment conditions.
  • [ ] Hardware delivery, facility access, customer activation and contractual billing dates.
  • [ ] Required resilience, network connectivity and cooling interfaces.
  • [ ] Next financial commitment, its deadline, refundability and maximum authorised exposure.

This is consistent with the kind of information a utility needs to develop a service plan: Dominion publishes a data-centre load-letter template and requests a site plan, load letter and ramp schedule in its connection process. Use the relevant utility’s own submission requirements rather than treating one template as nationally sufficient. (cdn-dominionenergy-prd-001.azureedge.net)

How should capacity be labelled?

Keep three separate fields in every comparison:

Field Working definition for this procurement
Utility service MW Capacity at the agreed utility delivery boundary, with voltage, conditions and phase stated
Critical IT MW Capacity available to the computing equipment at the specified contractual and electrical boundary
Campus potential MW A development ambition; exclude it from deliverable capacity until phase-specific evidence supports it

DOE distinguishes IT equipment consumption from total facility consumption, which includes cooling, power-delivery losses and other support loads. Consequently, do not substitute utility MW for IT MW or use an annual efficiency assumption as proof of peak electrical capability. (energy.gov)

Exit test: development, infrastructure and finance approve the same brief. Engage an electrical engineer immediately if the translation from equipment demand to required service is unresolved.

Sources & research context

Research snapshot: 2026-10-19. Sources and limitations are retained as supplied.

  1. cdn-dominionenergy-prd-001.azureedge.net
  2. www.energy.gov
Read the complete report and source register →

Put the evidence to work.

Keep your requirements, open questions and commitment conditions together.