Write a one-page load-and-date brief before asking suppliers for proposals. Otherwise, different parties may answer different questions.
What belongs in the brief?
- [ ] Site coordinates or acceptable geography, contracting entity and decision owner.
- [ ] Critical IT MW required in each phase, including compute, storage and networking.
- [ ] Proposed utility service demand, separately identified and subject to engineering confirmation.
- [ ] Rack quantities, exact equipment configurations and required rack density.
- [ ] Monthly load ramp, expected operating pattern and acceptable curtailment conditions.
- [ ] Hardware delivery, facility access, customer activation and contractual billing dates.
- [ ] Required resilience, network connectivity and cooling interfaces.
- [ ] Next financial commitment, its deadline, refundability and maximum authorised exposure.
This is consistent with the kind of information a utility needs to develop a service plan: Dominion publishes a data-centre load-letter template and requests a site plan, load letter and ramp schedule in its connection process. Use the relevant utility’s own submission requirements rather than treating one template as nationally sufficient. (cdn-dominionenergy-prd-001.azureedge.net)
How should capacity be labelled?
Keep three separate fields in every comparison:
| Field | Working definition for this procurement |
|---|---|
| Utility service MW | Capacity at the agreed utility delivery boundary, with voltage, conditions and phase stated |
| Critical IT MW | Capacity available to the computing equipment at the specified contractual and electrical boundary |
| Campus potential MW | A development ambition; exclude it from deliverable capacity until phase-specific evidence supports it |
DOE distinguishes IT equipment consumption from total facility consumption, which includes cooling, power-delivery losses and other support loads. Consequently, do not substitute utility MW for IT MW or use an annual efficiency assumption as proof of peak electrical capability. (energy.gov)
Exit test: development, infrastructure and finance approve the same brief. Engage an electrical engineer immediately if the translation from equipment demand to required service is unresolved.