The routes below are our suggested starting points; the numbered entries contain the links and evidence qualifications.
| Your next decision | Start here | Suggested output from the session |
|---|---|---|
| Extend a land option or pay a utility deposit | 1. PG&E grid readiness | A dated utility clarification request |
| Decide whether a parcel has an achievable approval route | 2. ACEC site selection, then 3. Catalyst backlash | A planning and stakeholder risk register |
| Compare electricity proposals during a phased ramp | 4. CoBank, then 5. Wood Mackenzie | A schedule of minimum payments, security and exit exposure |
| Commit to behind-the-meter generation | 6. Vinson & Elkins | A fuel, construction and payment-risk allocation matrix |
| Consider interruptible or flexible service | 7. Volts with Emerald AI | A workload-curtailment specification |
| Evaluate electrical compatibility with the intended GPUs | 8. NVIDIA/OCP | A request for dynamic load profiles and supporting design evidence |
| Challenge a “liquid-ready” claim | 9. OCP chemistry, then 10. Castrol | A coolant, commissioning and lifecycle responsibility schedule |
| Commit GPUs against a facility delivery date | 11. Oracle networking, then 12. ICxA | An integrated deployment and acceptance checklist |
| Reconsider location or procurement strategy | 13. CBRE and Digital Realty | A workload-specific location brief |
Sources & research context
Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.