Video and podcast roundups · 2026-10-16

Which recordings help before committing to land or utility service?

1. What does the utility actually mean by ready to serve?

Title: What data centers are getting wrong about grid readiness

Who and when: Latitude Media’s Maeve Allsup with Chelle Izzi, identified as PG&E’s chief commercial officer; 11 March 2026. Format: YouTube recording linked from the publisher’s replay page. Evidence: programme and replay listing, not a retrieved transcript. Event details.

Why it earns a place: The published programme directly addresses developer mistakes when approaching utilities, the capital risks behind proposed connection shortcuts, bridge-power strategies and differences in how utilities and developers define readiness. It also examines the utility–developer interface rather than treating power as a generic regional attribute. Published scope. (latitudemedia.com)

Our buyer application: Before the next land payment, ask the utility to identify the applicable load, service conditions, outstanding studies, network works, decision owners and dates. Keep the seller’s wording beside the utility’s wording.

Limit: This is a PG&E-focused conversation, not evidence of service at your parcel or a process that can be transferred unchanged to another territory.

2. How should site selection account for the path to approval?

Title: Data Centers: Site Selection to Approval

Who and when: Diana O’Lare interviews Flypower CEO Navdeep Martin for ACEC’s The Market Edge; 17 July 2026. Format: video podcast, with YouTube and Podbean links on the episode page. Evidence: publisher description. Episode source.

Key takeaways from the description: The discussion connects site selection with permitting, stakeholder concerns, local sentiment and political dynamics. Its useful distinction is between identifying land and identifying a credible approval route; AI-assisted site intelligence is presented as one input to that assessment. Publisher description. (engineeringinc.acec.org)

Our buyer application: Add a separate approval-path worksheet to the data center site selection checklist. Record the decision-making bodies, required hearings, unresolved studies, likely objections and the evidence needed before the next commitment.

Limit: The guest sells site-selection intelligence. The description does not independently validate that software’s predictive accuracy, and the episode should not be treated as a substitute for local planning advice.

3. Which community objections can a project redesign actually address?

Title: What comes after the data center backlash?

Who and when: Catalyst host Shayle Kann with Brian Janous, identified as Cloverleaf Infrastructure’s co-founder and chief commercial officer; 3 September 2026. Format: podcast. Evidence: published transcript. Episode and transcript.

Key takeaways: The conversation separates negotiable project impacts—such as noise, water use, infrastructure costs and electricity bills—from broader opposition to AI and its developers. It also considers the potential and limitations of bringing generation to a project, moving off-grid and using smaller distributed facilities. Transcript. (latitudemedia.com)

Our buyer application: Classify objections before commissioning mitigation work. Distinguish an engineering change, a commercial commitment, a disclosure problem and an objection that may persist despite redesign. Give each an owner and a decision date.

Limit: This is a developer-side discussion. Do not assume the speakers’ interpretation represents local residents, regulators or every affected community.

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.

  1. www.latitudemedia.com
  2. www.latitudemedia.com
  3. www.latitudemedia.com
  4. engineeringinc.acec.org
  5. www.latitudemedia.com
Read the complete report and source register →