There is no defensible single dollar total in the evidence reviewed. Electricity consumption, construction expenditure, facility inventory and transaction values measure different activities. The following dashboard deliberately keeps them separate.

Measure Figure and reference period Source date and evidence status Buyer interpretation
US data centre electricity consumption 176 TWh in 2023, approximately 4.4% of US electricity use Berkeley Lab’s 2024 assessment, summarised 15 January 2025; modelled historical estimate National demand baseline—not a 2026 observation. (newscenter.lbl.gov)
US electricity demand scenarios 325–580 TWh in 2028 Same assessment; scenario range Useful for demand sensitivities, not local connection availability. (newscenter.lbl.gov)
Implied electricity-demand growth Approximately 13–27% annually, 2023–2028 Desk calculation: (2028 scenario / 176)^(1/5) − 1 Growth implied by the scenarios, not a separately observed forecast. (newscenter.lbl.gov)
Private US data centre construction $84.95bn seasonally adjusted annual pace in August 2026, versus $49.05bn a year earlier Census-derived figures reported by Tom’s Hardware, 6 October 2026; secondary-source verification Roughly 73% year-on-year growth in the annualised spending pace—not $84.95bn spent during August. (tomshardware.com)
Primary-market facility supply 10,903 MW, H1 2026 CBRE, 27 August 2026; tracked wholesale-market observation A defined market sample, not the entire US installed base. (cbre.com)
Primary-market net absorption 1,456.2 MW, H1 2026; 11.7% above H1 2025 CBRE, 27 August 2026 Occupancy change, not gross lease-signing volume. (cbre.com)
Primary-market construction pipeline 7,481.1 MW, H1 2026; 80.4% preleased CBRE, 27 August 2026 Construction does not mean uncommitted supply. (cbre.com)
Global expansion outlook—context only Approximately 100 GW of additions over 2026–2030; 14% capacity CAGR JLL, 5 January 2026; forecast Global context; do not label it a US market forecast. (jll.com)

What does the construction figure include?

Census includes construction and building services such as mechanical and electrical installations. Its definitions explicitly exclude racks and servers; consequently, construction spending is not total AI infrastructure expenditure. (census.gov)

The Census release dated 1 October 2026 confirms August as the reporting month and describes current-month estimates as preliminary. However, the detailed data-centre spreadsheet could not be independently extracted during this research pass. The $84.95bn figure is therefore labelled secondary-source reported, rather than presented as a directly reconciled Census table entry. (census.gov)

Which market-size estimates should not be carried forward?

This report does not validate the supplied planning estimates for US wholesale-colocation revenue or the standalone high-density cooling market. It also does not add construction expenditure, electricity bills, financing commitments and multiyear lease revenue into an aggregate addressable market.

For an investment committee, the more useful sizing question is: how much suitably specified capacity can the project realistically sell or procure within its delivery window? That requires a local, dated competitive set rather than a national revenue estimate.

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.

  1. newscenter.lbl.gov
  2. www.tomshardware.com
  3. www.cbre.com
  4. www.jll.com
  5. www.census.gov
  6. www.census.gov
Read the complete report and source register →