What exactly are you buying?

Freeze the requirement before opening supplier scores. Otherwise, an offer can appear superior merely because it assumes a smaller load, later date or weaker operating obligation.

Complete this buyer brief:

Required field What to record
Decision under review Option extension, land acquisition, utility commitment, construction release, colocation contract or GPU shipment
Financial exposure Payment due now; refundable amount; cancellation exposure; later obligations triggered
Capacity Required critical IT MW by phase; maximum simultaneous load; other IT and facility loads
Hardware Exact rack/system configuration, rack count, electrical interfaces and cooling requirements
Dates Site access, energisation, facility acceptance, hardware installation and customer activation
Service conditions Permitted curtailment, maintenance interruptions, power caps and recovery requirements
Connectivity Carriers, route requirements, bandwidth, latency and installation responsibilities
Commercial limits Monthly cash ceiling, upfront funding limit, collateral capacity and acceptable downside
Accountability Buyer decision owner, technical approver, energy lead and legal reviewer

How should utility service MW and critical IT MW be normalised?

Use separate fields rather than one ambiguous “power available” number:

  • Utility service MW: the import capacity and conditions supported by the service arrangement at the specified delivery point.
  • Critical IT MW: the capacity available to the buyer’s IT equipment at the agreed electrical boundary and operating configuration.
  • Buyer-allocable MW: the portion assigned to this buyer after other contractual allocations and shared infrastructure constraints are reconciled.
  • Campus potential: expansion ambition; exclude it from committed capacity unless the relevant phase passes its own checks.

Record these as the scorecard’s working definitions and reconcile them with the actual contracts.

DOE defines power usage effectiveness, or PUE, as facility energy divided by IT energy and distinguishes infrastructure efficiency from overall computing efficiency. Consequently, this methodology does not accept annual PUE as sufficient proof of firm IT capacity or peak electrical capability. Require an engineer’s capacity reconciliation at the required operating conditions instead. (energy.gov)

For each phase, request a capacity bridge showing utility imports, any dependable on-site supply, facility auxiliaries, electrical losses, reserve arrangements, cooling limits and existing customer allocations. Do not add redundant equipment ratings together as if all of that capacity were simultaneously sellable.

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.