How should each criterion be scored?

Score the evidenced position, not the supplier’s confidence. Use integer ratings from zero to five, then cap them by evidence quality.

Performance rating

Rating Meaning
0 Demonstrated failure, or no usable evidence. Label these differently: F for failed and NE for not established.
1 Material weakness; predominantly an assertion or an unowned dependency
2 Partial solution; important scope, funding, timing or acceptance gaps remain
3 Credible solution with identified, costed conditions and accountable owners
4 Meets the stage-specific requirement with executable evidence and limited residual issues
5 Meets the requirement and has been independently challenged against relevant downside conditions, with acceptable controls and contingency

Award the highest anchor whose material requirements are all satisfied. Do not average away a failed critical subtest inside a criterion. Record non-critical exceptions separately.

Evidence cap

Evidence grade Maximum rating Required support
E0 0 No usable evidence, or a material contradiction remains unresolved
E1 1 Marketing, verbal assurance or an unverified supplier representation
E2 3 Traceable, site-specific study, design or conditional document; material execution conditions remain
E3 4 Applicable executed agreement, issued approval, acknowledged order or stage-appropriate acceptance record
E4 5 E3-quality evidence plus independent reconciliation, current confirmation and relevant downside validation

Apply the cap to the material claim, not merely to the document’s title. An executed agreement may prove an obligation while leaving the delivery date conditional. A test report for another hall does not prove this hall’s readiness.

Calculation

Effective rating = minimum(performance rating, evidence cap)

Weighted points = criterion weight × effective rating ÷ 5

Total score = sum of weighted points

Also report evidence coverage: the sum of weights supported by E3 or E4 evidence. This is a documentation measure, not a probability of completion or a readiness percentage.

Suggested decision thresholds

Result Recommended action
80–100, all relevant gates clear, and criteria 1–6 each at least 3 Eligible for approval of the specified next commitment, subject to the buyer’s authorised reviewers
65–79, without a blocker Conditional shortlist; close gaps, renegotiate or authorise only bounded further diligence
Below 65 Hold, redesign or seek alternatives
Any blocked/not-established mandatory gate, regardless of score Hold the affected commitment; define the evidence or redesign needed

These thresholds are governance recommendations. They do not establish financeability, creditworthiness or guaranteed delivery.

Sources & research context

Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.