Primary sources below support the factual examples and distinctions. The scoring system and decision rules are the desk’s proposed methodology.
- Dominion Energy — Data Center Requests. Site evaluation and connection dependencies. `https://www.dominionenergy.com/virginia/large-business-services/data-center-requests
- AEP Ohio — Data Center Tariff. Public process and commercial-term summary; project applicability requires confirmation. `https://www.aepohio.com/company/about/rates/data-center-tariff/
- Lawrence Berkeley National Laboratory — Electricity Rate Designs for Large Loads: 2026 Update. August 2026. `https://eta.lbl.gov/publications/electricity-rate-designs-large-0
- US Department of Energy — Best Practices Guide for Energy-Efficient Data Center Design. July 2024 edition. `https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design.pdf
- NVIDIA — DGX SuperPOD Architecture featuring DGX GB200. Updated 19 November 2025. `https://docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-gb200/latest/dgx-superpod-architecture.html
- NVIDIA — Mission Control Integration with Building Management System. Version 2.2.0; updated 10 August 2026. `https://docs.nvidia.com/mission-control/docs/nmc-software-installation-guide/2.2.0/integration-of-bms-with-bcm.html
- Open Compute Project — Guidelines for Pre-Commission Preparation of Technology Cooling System Row Manifolds. 2025 document. `https://www.opencompute.org/documents/ocp-document-submission-guidelines-for-pre-commission-preparation-of-technology-cooling-system-tcs-row-manifolds-revq-pdf-1
- Uptime Institute — Tier Certification of Constructed Facility. `https://uptimeinstitute.com/tier-certification/construction
- Uptime Institute — Awards Terms and Conditions. Certification scope and status. `https://atd.uptimeinstitute.com/awards-terms-and-conditions
- US EPA — Physical PPA. Physical versus financial electricity procurement. `https://www.epa.gov/green-power-markets/physical-ppa
- US EPA — Clean Air Act Resources for Data Centers. Air-permitting and stationary-engine resources. `https://www.epa.gov/stationary-sources-air-pollution/clean-air-act-resources-data-centers
- NERC — Characteristics and Risks of Emerging Large Loads. July 2025. `https://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/whitepaper-characteristics-and-risks-of-emerging-large-loads.pdf
- NERC — Computational Loads Standards Pass Final Ballot. 15 October 2026. `https://www.nerc.com/newsroom/nercs-computational-loads-standards-pass-final-ballot-advance-to-board-adoption
- ERCOT — Large Load Integration. Verification, study and energisation documentation. `https://www.ercot.com/services/rq/large-load-integration
- FERC — Targeted Action to Speed Large Load Integration. 18 June 2026. `https://www.ferc.gov/news-events/news/ferc-launches-aggressive-targeted-action-speed-large-load-integration
- Anthropic — Manufacturing Quality Engineer, Data Center Power & Cooling. Published recruitment responsibilities; not evidence of project delivery. `https://job-boards.greenhouse.io/anthropic/jobs/5397596008
Sources & research context
Research snapshot: 2026-10-16. Sources and limitations are retained as supplied.
